This is a great day for us! Yesterday, we had our private transformer installed in front of our house after three months of no city power due to an area transformer going bad. We want to thank all of you who contributed to this. It ended up costing a total of $ 4200.00. The city power came on last night and we have now had 18 hours of electricity. The city power just went out this afternoon. This is the most unbroken power we have had in the past several years. Before the area transformer burnt out, we were getting 6 hours of electricity a day. I think the difference is that they connected us to a high priority line.
These are several pictures of the installation of our own private transformer. As you can see everything was done manually, from the digging of the hole to the raising of the post and transformer. It was quite amazing to see.
God is so goood!
Incorrect installation may lead to fire or electric shock. So, before setting up and connecting a transformer in your premises, it is very important that you make a check on the following factors.
ReplyDeletePower transformers in India | Transformer Manufacturer in India